Wednesday 2 May 2012

Pemaenpool MPD (Building starts at last!)


Finally made a start on building Penmaenpool MPD

Butchered some wood and started track laying.

The first turnout and main running line are laid.
Hand built points and C&L track is being used.
The drawing pins are just to stop anything moving while the PVA sets. I don't use track pins, just glue.
Once ballasted it's not going anywhere.

                                                                                                                                                                                                            This picture shows the view from the Morfa Bach end looking towards the next board/fiddle yard.





                                                                                                                                 
















This view is looking away from the fiddle yard towards the Morfa Bach end. The "hole in the wall" can be seen and aligns with the tunnel exit on Morfa Bach.


















Another update as and when.

Cheers!
Frank

No comments:

Post a Comment