Wednesday, 21 November 2012

Is it a bird? is it a plane? NO It's TABARD MAN!

It's slowly getting to the point where my railway modelling hobby is starting to get expensive!

No, not for the cost of the materials and tools but my clothing is wearing out fast, not a week goes by without some sort of clothing damage.
Solder, Paint, Thinners, MEK, Fluxes and  glues of one sort or another have all left their mark in one way or another over the years.
It was getting to the point where I was struggling to get shirts laundered and ready to wear again before the next one got gummed up with one of the above materials or fluids!

What I needed was some sort of PPE (Personal Protective Equipment) to try and avoid the major splashes and accidents taking their toll on my shirts, trousers and the wife's comments!

Enter TABARD MAN!

I had looked at white lab coats, warehouse coats and a few other items of apparel before choosing the Tabard. Although designed with women in mind, this garment is just ideal for us modellers.
It offers protection while at the same time leaving the arms free, that was the drawback with the conventional Lab coat overall. Not only that, the front pocket is a great place to put odds and ends when working on the layout, Screws, wire, small tools and your ciggies and lighter too!
Once my new layout "Steam on the Cambrian" is finished and on the exhibition circuit I shall probably wear it   whilst operating! The front pocket being the ideal place for holding shunting poles, and somewhere to drop the hand held controller in to when both hands are needed to couple up or similar tasks.

I wonder if this idea will catch on?

Cheers
Frank





Saturday, 17 November 2012

A "Tail of Two Dogs" Part 5

 After the recent set back with the "Dukedog" chassis I decided to leave that one alone for a while until I can get some more replacement parts.
So, as I am a glutton for punishment I made an attempt at a clients "Bulldog" Chassis.
Now, my client had very thoughtfully provided a set of Romford drivers and extended axles, some Romford fly cranks and a few other better than the kit bits.
Despite using all brand new stuff, getting the chassis to run smoothly, quietly and reliably has taken me the best part of a week! Getting the quartering right with outside fly cranks is a nightmare anyway.
Well at last I have a running chassis!



I had left the chassis running for 24hrs in forward gear and the same in reverse so I would suggest it is now well and truly "Run in"!

Back to the bodies.
As I said earlier, the Dukedog came from Ebay already assembled but due to livery changes and alterations to a specific loco ended up being almost stripped back to kit form! It is now back together with top feed added and a few bits that are wrong removed!



My clients "Bulldog" loco body has been started too!
This very Saturday afternoon whilst most men are at some football stadium, freezing to death watching 22 blokes kick a bag of wind around a field OR being dragged round the local town centre by their SWMBO I was sat in my warm Kitchen/work area drinking coffee and soldering bits of white metal together. Much more satisfying I think!